Save Time by Using ECN’s to Push Changes from Engineering Master to Work Orders.

If you need to make the same changes to multiple Work Orders for the same part, then add the Engineering Master to an ECN and it will track the changes – any Material, Operations or Legs that are Added, Deleted or Edited.

When you are done editing the Engineering Master you can apply the changes to the selected Work Orders right from the ECN window.

BTW, you don’t have to add the Work Orders to the ECN, it’s a nice way to track those changes but not required.